|
Biodiesel is a way for Americans to take control of how they spend their money on fuel, keeping it in their local economy. Alternative Fuels are the next step in a grassroots evolution in lifestyle. Using sustainable energy is as revolutionary as the internet has been to communication. A Growing Community of biodiesel brewers and sustainable energy enthusiasts are right outside your door. Power your Car, Truck, Tractor, Generator or any other Diesel Equipment safely and efficiently with a natural alternative to traditional diesel fuel. |
||||||||||||||||||||||
|
"Description" The BDL-275 Packaged Processor System. It comes with a 600 micron WVO pre-filter, 330 gallon cone bottom stainless steel reaction vessel and 290 gallon holding/storage tank with integrated Amberlite dry wash cell, 1 micron final filter and maintenance access covers w/gasket, 80 gallon HDPE methyl/oxide mixing tank all mounted on a heavy duty steel stand. Every kit comes with an installed 220VAC 35 GPM oil mixing & dry wash transfer pump, 220VAC high speed methoxide prop mixer with stainless steel shaft and 3-blade prop, 110VAC glycerin removal pump, 110VAC fuel transfer pump, pneumatic methanol/methyl-oxide pump, internal 220VAC heaters, 220VAC flash separator/heater, methanol recovery condenser, visual level indication gage's, solid state low liquid level controls, nema-12 control panel, vacuum breaker, pressure relief valve, 264 lb Amberlyte charge, removable man-way cover for routine maintenance and cleaning of reactor, and step-by-step directions for use. The reactor is insulated with 1/4" high density ceramic fiber insulation and wrapped with a aluminum cover. The unit control panel features dual digital temperature controllers with illuminated push buttons for each process stage. A optional PLC driven 4.5 inch color touch screen with visual operating aids and instructions is available for an additional fee of $2,000.00. $48,000.00 F.O.B. Arab, Al 35016
BDL-275-PPS Step by Step Operation Note: Although you can dewater or precondition W.V.O in the reactor vessel. To get a shorter process time and the highest conversion possible we recommend that you either build a separate dewatering/preconditioning tank or purchase one of our purpose built Pre Conditioning Tanks. Note: Unit does not include WVO supply pump, you must either provide your own or purchase separately. |
Copyright 2005 Biodiesel Logic
All Rights Reserved